Renewing the Pentrough floor

The Pentrough and Penstock were renewed in early 2014. After the September 2014 Open Day, the last of the year, the flooring of the pentrough was also replaced. This required the removal of the penstock opening mechanism, the penstock and the three sides of the pentrough to gain access to the floor.        Return to Mill Diagram